• PRACTICE
  • CURRENT PROJECTS
    • C - RELIGIOUS
    • C - EDUCATIONAL
    • C - RETAIL
    • C - HOUSING
    • C - MASTER PLAN
    • C - HEALTHCARE
    • C - RESIDENTIAL
  • PAST PROJECTS
    • P - RELIGIOUS
    • P - RETAIL
    • P - INSTITUTIONAL
    • P - URBAN DESIGN
    • P - INDUSTRIAL
    • P - OFFICE
    • P - INTERIORS
  • VIDEOS
    • CURRENT PROJECTS
    • PAST PROJECTS
  • PROFILE
  • CONTACTS
  • More
    • PRACTICE
    • CURRENT PROJECTS
      • C - RELIGIOUS
      • C - EDUCATIONAL
      • C - RETAIL
      • C - HOUSING
      • C - MASTER PLAN
      • C - HEALTHCARE
      • C - RESIDENTIAL
    • PAST PROJECTS
      • P - RELIGIOUS
      • P - RETAIL
      • P - INSTITUTIONAL
      • P - URBAN DESIGN
      • P - INDUSTRIAL
      • P - OFFICE
      • P - INTERIORS
    • VIDEOS
      • CURRENT PROJECTS
      • PAST PROJECTS
    • PROFILE
    • CONTACTS
  • PRACTICE
  • CURRENT PROJECTS
    • C - RELIGIOUS
    • C - EDUCATIONAL
    • C - RETAIL
    • C - HOUSING
    • C - MASTER PLAN
    • C - HEALTHCARE
    • C - RESIDENTIAL
  • PAST PROJECTS
    • P - RELIGIOUS
    • P - RETAIL
    • P - INSTITUTIONAL
    • P - URBAN DESIGN
    • P - INDUSTRIAL
    • P - OFFICE
    • P - INTERIORS
  • VIDEOS
    • CURRENT PROJECTS
    • PAST PROJECTS
  • PROFILE
  • CONTACTS

ACKNOWLEDGEMENT

Projects presented in this section were carried out under another Architect or Architectural Firm. The partners of this firm have lead or were integrally involved in these following selected projects.


RELIGIOUS

NORTH SHORE CONGREGATION ISRAEL SYNAGOGUE ACCESSIBILITY COMPLIANCE

    Location:     Glencoe, Illinois

    Size:            not disclosed

    Value:          not disclosed

    Client:         NSCI

    SOUTH PARK CHURCH ADDITION & MASTER PLAN

      Location:      Park Ridge, Illinois

      Size:            18,000 sf

      Value:          not disclosed

      Client:          South Park Church


      Addition to existing structures of the Church that had to resolve the entrance to two distant building of varied functions. The addition negotiated the multiple level of entrance, presented a central connecting atrium building. The entrance building also oriented the parking which was reorganized and redesigned.

      • PRACTICE
      • PROFILE
      • CONTACTS

      Copyright ©2024 Noman Architects Inc. - All Rights Reserved.

      Powered by GoDaddy